to be fully fed by hydrogen has been built in the Porto Marghera area, next to the Enel plant of Fusina.
The experimental plant is a combined cycle in which a 12 MW hydrogen-fuelled turbo gas is well integrated with the existing coal-fuelled plant.
The fully integration with the existing power plant allows to further increase the efficiency of the plant thus reaching 41,6% as well as to increase the power produced burning the hydrogen that will reach about 16 MWe.